Pool Plans On Hold In Mt. Lebanon
After hours in meetings and touring other facilities, Mt. Lebanon commissioners decided Dec. 3 to postpone a decision on renovation of the swimming pool, letting the new commission to decide when assuming office in the new year.
The municipality spent $32,000 for a feasibility study carried out by Hunsaker-Counsilman from St. Louis. The recommendation came down to two options, $9,960,000 for a 50-meter competitive pool with a separate leisure pool, or $7,370,000 for a 25-meter competitive with a separate leisure pool.
Link: www.thealmanac.net/ALM/Story/12_12_ML_pool_postpone_B
The municipality spent $32,000 for a feasibility study carried out by Hunsaker-Counsilman from St. Louis. The recommendation came down to two options, $9,960,000 for a 50-meter competitive pool with a separate leisure pool, or $7,370,000 for a 25-meter competitive with a separate leisure pool.
Link: www.thealmanac.net/ALM/Story/12_12_ML_pool_postpone_B
Labels: mt. lebanon commission, municipal pool
0 Comments:
Post a Comment
<< Home